Office LED Lighting Upgrade in Progress
- JLEC Electrical
- Mar 14, 2018
- 1 min read
Low glare LED lighting panels to form part of a LED LG07/15 installation at an office space in Manchester.

Work is in progress to remove the old circular light fittings and upgrade this office space to an area suitable for VDU use
A lighting design has been carried out in accordance with LG07/15. In this particular project the ceilings are particulary high

'Remeber, not all LED panels meet the criteria of low glare in an office environment... Check it out if you are unsure..'
Comments