
IT Suite Comms Relocation
JLEC Electrical were successful in a tender to relocate three comms cabinets to another location within the same building for operational purposes. As with many comms cabinets we come across, the patching from cabinets to cabinets were in an extremely messy condition. These cabinets consisted of a Cat6 structured cable installation of around 250 points, Cat6A structured cabling installation of 48 point linking to other cabinets within the IT suite and Fibre Optic patch panels